CONSTRUCTION OF TWO HEATING PLANTS
EVN BULGARIA, Plovdiv

CONSTRUCTION OF TWO HEATING PLANTS

Implementation started in March 2020.

ENERGAN-95 OOD IS A SUBCONTRACTOR TO POWER ENGINEERING STARA ZAGORA

UNDER THIS PROJECT, STOPPING AND REGULATING FITTING WILL BE DELIVERED IN THE PERIOD 03-08.2020 SUCH AS: butterfly valves, stop valves, gate valves, ball valves, non-return valves, balance valves, regulating valves with direct action and electric actuator, breathing valves, shut-off valves gas valves.

CONSTRUCTION OF A FLUE GAS CLEANING INSTALLATION
TOPLOFIKATSIA RUSE

CONSTRUCTION OF A FLUE GAS CLEANING INSTALLATION

ENERGAN-95 OOD SUPPLIES STOP FITTING:

  • BUTTERFLY VALVES,
  • GATE VALVES,
  • BLADES,
  • SOLENOID VALVES

Deliveries are made in the period: June-August 2020.

PROJECT FOR BROW 140/15 FOR THE CITY OF BURGAS
LUKOIL Neftohim Burgas AD

PROJECT FOR BROW 140/15 FOR THE CITY OF BURGAS

The implementation started in September 2021.

COMPANY ENERGAN-95 LTD DELIVERS

  • THE ARMATURE
  • REDUCTION COOLING DEVICE AND THE AUXILIARY FITTINGS TO IT
  • GATE VALVES AND BREATH VALVE

The fittings will be delivered in the period 03-08.2023.

DELIVERY OF FITTINGS FOR THE FLUE GAS CLEANING SYSTEM
TEC MARITSA-3, DIMITROVGRAD TOWN

DELIVERY OF FITTINGS FOR THE FLUE GAS CLEANING SYSTEM

Energan-95 Ltd. is a supplier of fittings:

  • Butterfly flaps and blade flaps

Deliveries were made in the period: September-December 2022.

SUPPLY OF EXHAUST GAS DAMPERS AND DISC VALVES
Aurubis Bulgaria, PIRDOP TOWN

SUPPLY OF EXHAUST GAS DAMPERS AND DISC VALVES

Energan-95 Ltd. organizes the delivery of the dampers, produced by Swedenborg, Sweden.

Two pcs. are delivered. disc dampers 1800x1600 mm and guillotine dampers sizes D2000 - 2 pcs and D2400 - 2 pcs

Deliveries are made in the period: September 2022 - August 2023.