CONSTRUCTION OF TWO HEATING PLANTS
EVN BULGARIA, Plovdiv

CONSTRUCTION OF TWO HEATING PLANTS

Implementation started in March 2020.

ENERGAN-95 OOD IS A SUBCONTRACTOR TO POWER ENGINEERING STARA ZAGORA

UNDER THIS PROJECT, STOPPING AND REGULATING FITTING WILL BE DELIVERED IN THE PERIOD 03-08.2020 SUCH AS: butterfly valves, stop valves, gate valves, ball valves, non-return valves, balance valves, regulating valves with direct action and electric actuator, breathing valves, shut-off valves gas valves.

CONSTRUCTION OF A FLUE GAS CLEANING INSTALLATION
TOPLOFIKATSIA RUSE

CONSTRUCTION OF A FLUE GAS CLEANING INSTALLATION

ENERGAN-95 OOD SUPPLIES STOP FITTING:

  • BUTTERFLY VALVES,
  • GATE VALVES,
  • BLADES,
  • SOLENOID VALVES

Deliveries are made in the period: June-August 2020.

PROJECT FOR BROW 140/15 FOR THE CITY OF BURGAS
LUKOIL Neftohim Burgas AD

PROJECT FOR BROW 140/15 FOR THE CITY OF BURGAS

The implementation started in September 2021.

COMPANY ENERGAN-95 LTD DELIVERS

  • THE ARMATURE
  • REDUCTION COOLING DEVICE AND THE AUXILIARY FITTINGS TO IT
  • GATE VALVES AND BREATH VALVE

The fittings will be delivered in the period 03-08.2023.

DELIVERY OF FITTINGS FOR THE FLUE GAS CLEANING SYSTEM
TEC MARITSA-3, DIMITROVGRAD TOWN

DELIVERY OF FITTINGS FOR THE FLUE GAS CLEANING SYSTEM

Energan-95 Ltd. is a supplier of fittings:

  • Butterfly flaps and blade flaps

Deliveries were made in the period: September-December 2022.

SUPPLY OF EXHAUST GAS DAMPERS AND DISC VALVES
Aurubis Bulgaria, PIRDOP TOWN

SUPPLY OF EXHAUST GAS DAMPERS AND DISC VALVES

Energan-95 Ltd. organizes the delivery of the dampers, produced by Swedenborg, Sweden.

Two pcs. are delivered. disc dampers 1800x1600 mm and guillotine dampers sizes D2000 - 2 pcs and D2400 - 2 pcs

Deliveries are made in the period: September 2022 - August 2023.

Delivery of Heat-resistant pipes
LUKOIL Neftohim Burgas AD

Delivery of Heat-resistant pipes

Order No. A202300974 dated 05.03.2024 with the subject "Delivery of Heat-resistant pipes"

 The delivery was made on 27.01.2025 

The following pipes were delivered under this project: 

1. Seamless pipes, material ASTM A335 P9

  • Size: 168.28x7.11 mm, Quantity: 74 pcs. Pipes with a length of each within 8800-9000 mm, Total weight: 18950 kg
  • Size: 141.3x6.55 mm, Quantity: 26 pcs. Pipes with a length of each within 8800-9000 mm, Total weight: 5130 kg 

2. Seamless pipes, material ASTM A312 TP310S

  • Size: 48.26x5.08 mm, Quantity: 1 pc. with a length within 7000-7100 mm, Total weight: 40 kg
Delivery of different type of valves
THERMAL POWER STATION TOWN OF PERNIK

Delivery of different type of valves

THERMAL POWER STATION IN TOWN OF PERNIK

PROJECT: Delivery of different type of valves for new Co-Generation System

Contract for delivery of 27.05.2025 The delivery will take place in the period 03.06.2025 - 14.10.2025.

A total of 231 fittings were delivered under this project:

  • Gate valves with electric actuators with sizes in the range of DN50-DN300 Ру16- 40 pcs
  • Gate valves with manual actuators with sizes in the range of DN50-DN300 Ру16- 49 pcs;
  • Butterfly valves with electric actuators with sizes DN150 and DN450 Ру16- 4 pcs:
  • Butterfly valves with manual actuators with sizes DN100 and DN150 Ру16- 24 pcs:
  • Swing check valves, Steam traps, Ball valves with pneumatic actuators, Three-way and Two-way control valves with electric actuators, Silencer